User's Manual Part 1
Electronic Instrument Installation
TDC-0838-001 2.4GZ OpenWay Gas Module Installation Guide - Remote Mount 47
Proprietary and Confidential
4. If the field pulse cable is smaller than a 0.2-inch diameter, install the rubber tube supplied with the TCI
onto the cable so the strain relief will clamp onto the tube after it is re-installed.
5. Connect the individual external pulse cable conductors to the un-terminated wires following
Configuration for two endpoints connected to one TCI at the beginning of these instructions. Insert one
un-terminated wire into an opening of a gel-connector (six gel-connectors were included with the TCI).
Insert the appropriate field cable wire into the other gel-connector opening.
6. Verify both wires are fully inserted into the gel-connector prior to crimping.
Important Use a crimping tool compatible with gel-connectors. Do not use a standard pliers for crimping
gel-connects. The crimping tool provides an even pressured crimp to make a secure connection.
7. Insert the gel-connected wires into the threaded gray adapter plate hole.
8. Replace the strain relief and tighten until secure.