User's Manual Part 1
Rotary Meter Installation
TDC-0838-001 2.4GZ OpenWay Gas Module Installation Guide - Remote Mount 22
Proprietary and Confidential
3. After completing the wiring connections, install a cable tie to the meter cable just below the exposed
colored lead wires on the cable insulation. Remove the excess cable tie using a hand-held sidecutter
pliers. The cable tie performs as a cable strain relief to mitigate the risk of destructive tension on the
lead wires.
4. Tuck the three gel connectors and cable tie inside the module housing. Position the cable tie as shown
in the placement schematic below.
5. Install the 2.4GZ OpenWay remote mount gas module backplate using the four screws previously
removed from the module and a Torx T-15 screwdriver. Install the new 2.4GZ OpenWay remote mount
gas module on the wall or a pipe using the Remote Endpoint Mount Kit (Itron part number CFG-0005-
003). See Mounting the 2.4GZ OpenWay Remote Mount Gas Module on page 8 for mounting
instructions.