User's Manual

TDC
-0909-006 100W/100W+ and 100WP/100WP+ Datalogging Water ERT Module Installation Guide 41
Proprietary and Confidential
This section describes connecting the 100W/100W+ and 100WP/100WP+ ERT module with flying leads to
the water meter register using the Itron Splice Kit.
Caution ERT module wire terminations must be properly sealed with a non-conductive gel
material to prevent water intrusion (otherwise, this configuration should not be used in a pit box
environment). Itron recommends the 5-foot or 20-inch cable configuration for OEM users only.
Required Materials
E-9R 3M® gel cap crimping tool
Itron Splice Kit (OEM-0034-002)
100W/100W+ and 100WP/100WP+ ERT Module with flying leads
To install the Itron splice kit
1. Push the corresponding register and ERT module wires as far as possible into the connector.
Caution Do not strip insulation from the ends of the wires before inserting them into the connector.
A PPENDIX B
U
sing the Itron Splice Kit