User's Manual
Installing the 100W Endpoint
TDC-0909-002 100W and 100WP Pit Datalogging Water Endpoint Installation Guide 16
Proprietary and Confidential
5. For concrete-type pit boxes, it may be necessary to use a screw anchor. Choose an anchor appropriate for
a #10 pan head screw.
Caution Do not over-tighten the mounting screws. Over-tightening the mounting screws may break the
endpoint mounting tabs.
6. Start a screw into the pilot hole. Using the top hole of the endpoint, set the endpoint over the screw head
and slide it down so the screw is now at the top of the notch (as shown). Carefully tighten the screw until
snug. Over-tightening the mounting screw could crack the endpoint housing.
Note If mounting requires a screw anchor, mark the location of the bottom anchor and remove the
endpoint. Drill the required mounting hole, insert the anchor, and re-attach the endpoint.
7. Holding the 100W endpoint in the upright position, drill the second pilot hole. Use the bottom mounting
hole as a template.
Caution Any endpoint position other than upright may negatively affect radio performance and battery
life.
8. Screw the bottom screw into the pilot hole until snug. Do not over-tighten the mounting screw.