User's Manual

Installing the 100W Endpoint
TDC-0909-002 100W and 100WP Pit Datalogging Water Endpoint Installation Guide 14
Proprietary and Confidential
6. The top of the rod must be 3-1/2 inches below the bottom of the lid. Place the endpoint on the rod.
Completely insert the rod into the endpoint's rod mount hole. Do not force the endpoint onto the rod. If the
endpoint does not slide freely on the rod, remove the endpoint and examine the endpoint rod hole and rod
for burrs or obstructions. You may secure the endpoint to the rod with a self-drilling screw through the
hole in the top of the 100W rod mount cavity. The screw mounting hole is shown in the following product
image.
7. Installation is complete when the endpoint is perpendicular to the underside of the lid. The endpoint must
not contact the pit structure or lid.
Caution Verify the pit lid does not touch the endpoint when the lid is replaced. There must be a 1 to 2-
inch space between the top of the endpoint and the bottom of the pit lid. If the 100W endpoint is installed
too high, too low, or is touching any of the surrounding surfaces, adjust as necessary.