User's Manual
Installing the 100W Endpoint
TDC-0909-002 100W and 100WP Pit Datalogging Water Endpoint Installation Guide 11
Proprietary and Confidential
To install a cable tie to the connector
1. Thread the cable tie through the security holes in the connector and the protective cover.
2. Thread the cable tie end through the eye of the cable tie.
3. Pull the cable tie tight to secure it (as shown).
4. Remove the excess cable tie.
Rod Mount Installation
100W endpoints can mount below the pit lid on a customer-supplied 1/2-inch OD rod. The example
installation described in this section uses a fiberglass rod. For more information, visit www.itron.com and
reference the Water Meter Compatibility List (PUB-0063-002).
Warning The rod installation area must be free from other pipes, wires, or facilities that may be
damaged by driving a rod into the ground.
Caution You must follow local codes when using the rod mount installation method. Failure
to use 1/2-inch rod and follow instructions may result in an unreliable installation.
Caution Observe the following guidelines for mounting the 100W using the wall mount
procedure:
Endpoint positioning other than upright could negatively affect radio
performance and battery life.
Use only Itron-approved splice kits or inline connectors.