User's Manual
Installing the 100W Endpoint
TDC-0909-002 100W and 100WP Pit Datalogging Water Endpoint Installation Guide 27
Proprietary and Confidential
1. Insert the pointed end of the security seal through the inline connector and the 100W connector security
holes.
2. Insert the pointed end of the security seal into the capped end and push until the seal locks.
This completes 100W endpoint and Leak Sensor connections.
Pipe Preparation
Clean any dust or dirt from the pipe to facilitate direct contact with the LS surface.
To install the Leak Sensor on a pipe or meter insetter
1. Select a Leak Sensor mounting location within 5-feet of the 100W endpoint. Mount the sensor on the
water input side of the meter.
Caution Mount the Leak Sensor on the water input side of the meter. Failure to follow this mounting
requirement could result in errors in the leak detection data. Installation requires Itron mounting hardware.
Repair costs and service charges relating to the use on non-compliant mounting hardware will be charged
to the customer. Contract Itron Support for more information.