User's Manual
Table Of Contents
- Before You Begin
- About the 100W Datalogging Endpoint
- Initializing and Connecting the 100W Datalogging Endpoint
- Installing the 100W Datalogging Endpoint
- Optional Remote Antenna Installation
- Using an Inline Connector
- Index
TDC-0909-000 100W Datalogging Endpoint Installation Guide 1
Proprietary and Confidential
This document provides the installation instructions for the 100W datalogging endpoint and
includes rod mount, wall mount, through-lid (remote antenna), and shelf mount installation.
The 100W is available with the following configurations:
Integral connector
5-foot open-end cable
20-inch open-end cable
An optional Itron Leak Sensor is available for all three configurations to provide leak
monitoring capability. 100W endpoint configurations provide an easy interface to several
register types. The 20-inch cable variant allows meter manufacturers to mount the endpoint
directly to their respective meter registers before delivery to the installer.
Caution Installing an integrated 100W endpoint and meter register in
a water pit box reduces the endpoint's RF signal distance significantly.
If read reliability is a problem, install a remote antenna or select a new
installation method.
How This Document is Organized
This document is organized into the following chapters:
Chapter
Description
1. Before You Begin
Information about this publication.
2. About the 100W
Overview of 100W installation.
3. Initializing and Connecting the
100W
Instructions to initialize the 100W endpoint and
connect the endpoint to the water meter.
4. Installing the 100W
Step-by-step endpoint installation instructions for:
Rod mount
Wall mount
Remote antenna (CFG-0900-001)
Pit lid shelf mount (kit CFG-1300-001)
Base mount
5. Optional Remote Mount Antenna
Installation
Step-by-step remote mount antenna installation
instructions.
Appendix
Step-by-step instructions to install inline
connectors.
C H A P T E R 1
Before You Begin