User's Manual

Chapter 4 Installing the 100W Datalogging Endpoint
16 TDC-0909-000 100W Datalogging Endpoint Installation Guide
Proprietary and Confidential
Base Mount Installation
The 100W may be mounted to a flat surface using the base tab.
Caution Observe the following guidelines for mounting the 100W using the
wall mount procedure:
Endpoint positioning other than upright could negatively affect
radio performance and battery life.
Do not use gel connectors in pit environments.
Use only Itron-approved splice kits or inline connectors.
Required Base Mounting Tools and Hardware
Drill and drill bits appropriate for mounting location material.
Common hand tools for the selected fastening method.
Mounting screws: #10 size pan head screws appropriate for the wall or pit box
material.
To install the 100W using the base mount procedure
1. Select a flat surface.
2. Position the endpoint vertically.
3. Mark the location of the mounting hole.
4. Drill a pilot hole in the mounting location material. Follow the screw manufacturer's
recommendation for the size of the pilot hole.
5. Position the 100W and insert a #10 pan head screw in the base mounting tab.
Carefully tighten the mounting screw until the 100W is secure.
Caution Do not over-tighten the mounting screws. Over-tightening the mounting
screws may break the endpoint mounting tabs.