User's Manual

TDC
-1344-000 100T-CP Cathodic Protection Telemetry Module Installation Guide 10
Proprietary and Confidential
This section provides the instructions to connect the 100T-CP to the cathodic protection test station.
Buried Reference Cell Installation
The 100T-CP must be connected to a Cu-CuSO4 reference cell designed for burial to measure pipe to soil
voltage. The reference cell must be purchased from a third-party vendor and installed according to the
manufacturer's specifications.
To connect the 100T-CP to the lightning suppressor and buried reference cell
1. Confirm test station integrity by using a voltmeter to read the pipe to soil voltage at the structure and
reference cell terminals on the test station terminal board.
2. Connect the lightning suppressor hook terminals to the test station terminal posts following the table
below and tighten the connections. Insert the lightning suppressor down into the riser post.
Note The lightning suppressor (CFG-5006-710) will not fit into a <1" riser post.
Lightning Suppressor Connection Table
Red lightning suppressor wire Test lead(s) connected to pipe
Black lightning suppressor wire To test lead from buried reference cell
Connecting the 100T
-CP Module to the Test Station