User's Manual

Mounting the 100T-CP Module on the Test Station Post
TDC
-1344-000 100T-CP Cathodic Protection Telemetry Module Installation Guide 6
Proprietary and Confidential
2. Remove the pipe bracket and band clamp from the hardware kit (Itron part number CFG-5006-701).
3. Loosen the band clamp screw until the end of the band releases.
4. Push the end of the clamp's band through the holes in the pipe bracket. Itron suggests orienting the pipe
bracket as shown below.
5. Place the band clamp around the riser pipe approximately 3-1/2" below the test station base or
approximately 2" below the previously drilled hole. The band will loosely wrap around the riser post.
6. Push the end of the band through the band clamp screw assembly. Turn the band clamp's screw assembly
to fit into the pipe bracket opening.
7. Tighten the clamp screw (using a flat bladed screwdriver or 5/16" nut driver) until the band clamp is
secure on the pipe.
Caution The pipe bracket must fit firmly against the riser post to prevent slippage.
8. Align the mounting plate screw holes to the pipe bracket adapter plate screw holes.