User's Manual

Flat Surface Mounting
3. Install the Phoenix connector (supplied by Mercury). Connect the red, blue and white
wires to the Phoenix connector terminals as directed in
Code Settings on page 3.
NOTE In EC-AT units, the connector might be soldered to the pulse board.
4. Install the connector so that the"K" terminal is topmost, leaving some slack in the
cable.
Natural Gas Solutions 100G Installation Guide for Mercury Electronic Volume Correctors 27
DRAFT