User's Manual
Table Of Contents
- Document Conventions
- 100G Datalogging Remote Disconnect Gas Endpoint
- Itron METRIS 250 Meter Installation
- To remove the index from the meter
- To assemble the 100G Datalogging Remote Disconnect Gas endpoint and index
- To program the 100G Datalogging Remote Disconnect Gas endpoint
- To attach the 100G Datalogging Gas Endpoint to the meter
Programming the 100G Datalogging Remote Disconnect Gas Endpoint Assembly
100G Datalogging
Installation Guide – Remote Disconnect
TDC-0844-000 15
To program the 100G Datalogging Remote Disconnect Gas endpoint
1. Program the index drive rate into the endpoint using the FC200SR. For all
programming and "Check Endpoint" operations, hold the FC200SR as close to vertical
as possible. For best success, keep the FC200SR within 6 feet of the target endpoint.
Verify you have the correct programming mode (Fixed Network Mode,
Mobile/Handheld Mode, or Hard to Read Mobile/Handheld Mode) for your
application. Programming parameters are based on the configuration file loaded into
the FC200SR.
During programming, the endpoint is set to the nearest 100 cubic feet; the last two
digits (tens and units) are programmed as zeros (0). After programming is complete,
the endpoint assembly will read to the nearest cubic foot.
2. Slowly turn the endpoint's drive wriggler two turns in the direction shown on the
index drive rate. This verifies the endpoint is counting properly after assembly.
Caution Do not turn the drive wriggler faster than one turn per second.
Read or Check the endpoint using the FC200SR.
• If the read result is higher than the number programmed in Step 1, the endpoint
is counting correctly.
• If the read result is not higher than the number programmed in Step 1, replace
the endpoint.