User's Manual

Chapter 2 Itron METRIS 250 Meter Installation
14 100G Dataloggin
g
Installation Guide – Remote Disconnec
t
TDC-0884-00
0
Programming the 100G Datalogging Remote Disconnect Gas
Endpoint Assembly
The 100G Datalogging Remote Disconnect Gas endpoint must be programmed with
the FC200SR handheld computer loaded with Endpoint-Link
®
or Endpoint-Link Pro
®
software version 5.3 or higher. See the Endpoint-Link v5.3 (or later) Endpoint
Programming Guide (TDC-0744) for more complete programming information.
Caution The 100G Datalogging Remote Disconnect Gas Endpoint must be
programmed before use. Follow the steps in this section to properly program the
endpoint.
Take note of the index drive rate shown on the drive dial on the index. The endpoint is
programmed based on the drive rate. Itron METRIS 250 meter index drive rates are
typically 2-cubic feet or 0.05 cubic metres (not shown below).