User's Manual
Table Of Contents
- Document Conventions
- 100G Datalogging Remote Disconnect Gas Endpoint
- Itron METRIS 250 Meter Installation
- To remove the index from the meter
- To assemble the 100G Datalogging Remote Disconnect Gas endpoint and index
- To program the 100G Datalogging Remote Disconnect Gas endpoint
- To attach the 100G Datalogging Gas Endpoint to the meter
C HAPTER 2
Itron METRIS 250 Meter Installation
This chapter provides the instructions to install the 100G Datalogging Remote Disconnect
Gas endpoint on an Itron METRIS 250 meter.
To remove the index from the meter
1. Remove the tamper seals, index cover screws and the index cover from the Itron
meter. Examine the mounting screws. If they are 5/8" long and not corroded, keep
them to re-attach the endpoint assembly. If the screws are not the correct length or if
the screws are corroded, discard.
Note Use the removed index cover as a temporary storage container for
screws. Properly dispose all unused screws, old index covers, gaskets, tamper
seals, and other leftover materials. Do not leave materials on customer premises.
100G Datalogging
Installation Guide – Remote Disconnect
TDC-0884-000 11