User's Manual
Table Of Contents
- Document Conventions
- 100G Datalogging Remote Disconnect Gas Endpoint
- Itron METRIS 250 Meter Installation
- To remove the index from the meter
- To assemble the 100G Datalogging Remote Disconnect Gas endpoint and index
- To program the 100G Datalogging Remote Disconnect Gas endpoint
- To attach the 100G Datalogging Gas Endpoint to the meter
Chapter 1 100G Datalogging Remote Disconnect Gas Endpoint
10 100G Dataloggin
g
Installation Guide – Remote Disconnec
t
TDC-0884-00
0
Installation Overview
Installing the 100G Datalogging Remote Disconnect Gas endpoint on a meter involves four
tasks:
1. Removing the index from the meter.
2. Assembling the 100G Datalogging Remote Disconnect Gas endpoint and index.
3. Programming the 100G Datalogging Remote Disconnect Gas endpoint assembly.
4. Attaching the 100G Datalogging Remote Disconnect Gas endpoint to the meter.