User's Manual
Electronic Instrument Installation
3. GE Dresser IMC/W2 and MC2 cables are typically delivered with a cable tie installed. If the meter cable
does not include a cable tie, install a tie to the cable just below the exposed colored lead wires on the cable
insulation. Remove the excess cable tie using a hand-held side-cutter pliers. The cable tie performs as a
cable strain relief to mitigate the risk of destructive tension on the lead wires.
4. Tuck the three gel connectors and cable tie inside the ERT module housing, as shown. Position the cable
tie as shown by the arrow.
5. Install the 100G series remote gas module backplate using the four screws previously removed from the
ERT module and a Torx T-10 screwdriver.
Important Verify the cable tie and gel connectors are inside the module housing and the cable extends
out of the slot in the backplate. Torque the backplate mounting screws to 9-12 inch-pounds.
Installing the ERT Module to the GE Dresser Micro Corrector (IMC/W2 or
MC2)
GE Dresser offers a mounting bracket kit assembly to mount Itron's 100G series remote gas module to the
IMC/W2.
GE Dresser Mounting Bracket Kit
(GE Dresser Part Number 057783-000)
Quantity
Description
GE Dresser Part Number
1 Mounting bracket 015951-000
1 Screw, 8-32 x 7/16-inch 000163-277
2 Screw, 8-32 x 3/4-inch 000163-282
3 Nut, 8-32 012829-005
4 Spacer, #10 053669-001
4 ERT module/bracket mounting screw, M6 x 20 mm 013444-002
TDC-0824-014 100G Series Gas ERT Module Installation Guide, Remote Mount 53
Proprietary and Confidential