User's Manual
Electronic Instrument Installation
Installation Prerequisites
100G series remote gas module installation to a volume corrector or instrument requires:
• 100G series remote gas module ERT module compatible to a volume corrector or instrument (see the
100G Series Remote ERT Module Meter Compatibility List on page 4).
• Volume corrector or instrument compatible with the remote ERT module.
• Proper tools and devices for installation and programming (see Installation Prerequisites on page 7).
Installation Overview
Installing the 100G series remote gas module to a volume corrector or instrument involves five tasks:
1. Programming the volume corrector or instrument. See the manufacturer's documentation for specific
corrector or instrument parameters.
2. Installing corrector or instrument manufacturer retrofit parts (if necessary).
3. Attaching the ERT module to a pipe or vertical flat surface (wall) (see Mounting the 100G series remote
gas module on page 9).
4. Connecting the ERT module to the volume corrector or instrument (see To wire the 100G series remote
gas module to the Honeywell Instrument on page 43), Honeywell Instrument Temperature Compensating
Index (TCI), GE Dresser Micro Corrector (IMC/W2 or MC2), Galvanic Gas MPplus Micro Corrector, or
Eagle Research MPplus corrector.
5. Programming the 100G series remote gas module (see Programming the Remote ERT Module on page
38).
TDC-0824-014 100G Series Gas ERT Module Installation Guide, Remote Mount 42
Proprietary and Confidential