User's Manual
Rotary Meter Installation
To prepare the GE Dresser D800/D1000 meter for the ERT module installation
1. Loosen and remove the two screws holding the mounting brackets to the meter.
After the brackets are removed, the pulse output cable is visible.
2. Loosen the cable gland and pull the cable out until it extends 7.5 to 8" out of the cable gland.
3. Tighten the cable gland. Do not use a plier or wrench to tighten the cable gland.
TDC-0824-014 100G Series Gas ERT Module Installation Guide, Remote Mount 22
Proprietary and Confidential