User's Manual

Diaphragm Meter Installation
TDC-0824-003 100G Datalogging FN ERT Module Installation Guide - Remote Mount 62
Proprietary and Confidential
5. Remove the excess cable tie with a side-cutting pliers. Dispose excess cable tie properly.
6. Remove the protective backing on the replacement gasket to expose the adhesive side of the gasket. Align
the gasket (1), encoder cable (2), and cable tie (for strain-relief) (3) on the meter as shown.
Caution Route the encoder cable inside the index cover to provide strain relief (minimize pulling or
twisting on the encoder). Verify the strain-relief cable tie on the encoder cable is inside the index cover
when the cover is installed on the meter. The gasket must align with the index cover screw holes and
adhere to the meter face to insure a proper seal after the index cover is installed.
7. Install the four index cover screws and tighten just enough to hold the screws in place.