User's Manual

100G Datalogging Installation Guide - Direct Mount 11
This chapter provides instructions to install the 100G Datalogging Gas Endpoint on an
Elster American Meter.
Installing the 100G Datalogging Gas Endpoint involves four tasks:
1. Removing the index from the meter.
2. Assembling the 100G Datalogging Gas Endpoint and index.
3. Programming the 100G Datalogging Gas Endpoint assembly.
4. Attaching the 100G Datalogging Gas Endpoint assembly to the meter.
Note Properly dispose all unused screws, old index covers, gaskets, tamper seals,
and other leftover materials. Do not leave materials on customer premises.
To remove the index from the meter
1. Remove the four index cover screws and the index cover from the Elster American
meter. Alternate screw removal following the numbered pattern in the photo.
C
HAPTER
2
Elster American Meter Installation