User's Manual
TDC-0823-005 100G Datalogging Installation Guide - Direct Mount 42
Proprietary and Confidential
This chapter provides instructions to install the 100G Datalogging gas endpoint on 175 - 250 CFH
National/Lancaster meters.
To remove the index from the meter
1. Remove any tamper seals from the index cover screws. Remove the index cover screws and the index
cover from the meter. Discard the index cover mounting screws and index cover. The 100G Datalogging
gas endpoint includes new, different-size endpoint mounting screws
Note You may use the removed index cover as a temporary storage container for
screws. Properly dispose all unused screws, old index covers, gaskets, tamper
seals, and other leftover materials. Do not leave materials on customer premises.
C H A P T E R 5
National/Lancaster Meter Installation