User's Manual
Elster American and Itron Actaris Commercial Meter Installation
TDC-0823-005 100G Datalogging Installation Guide - Direct Mount 62
Proprietary and Confidential
Installing the 100G Datalogging Commercial Gas Endpoint on
an Itron Commercial Meter
This section provides instructions for installing the 100G Datalogging commercial gas endpoint on
Itron/Sprague/Schlumberger 675A, 800A, and 1000A commercial meters. Installation requires an Itron
adapter kit available from Itron, Owenton, KY.
Itron Adapter Kit (Part Number 80005901-001)
Adapter plate
Endpoint mounting screws (4)
Screw bushings (4)
Tamper seals
Extension driver
Follow Removing the Index/Index Assembly from the Meter on page 52 to prepare the Itron/Schlumberger
meter for installation. Program the 100G Datalogging commercial gas endpoint (see Programming the 100G
Datalogging Gas Endpoint Assembly on page 55) prior to installation.