User's Manual
Dresser ROOTS® Commercial Rotary Meter Installation
TDC-0823-005 100G Datalogging Installation Guide - Direct Mount 86
Proprietary and Confidential
Insert the last mounting screw and tighten until snug. Tighten the remaining mounting screws in an
alternating, diagonal pattern until snug. Tighten all mounting screws evenly.
Warning A gap may be caused by misalignment of the endpoint wriggler and
meter wriggler's drive teeth. Pushing down on the endpoint could damage the
endpoint wriggler or meter drive teeth. To eliminate a gap, remove the
endpoint assembly and re-align the endpoint wriggler with the meter drive
dog.
2. Complete necessary paperwork and verify all excess materials are removed from the customer's premises.
100G Datalogging residential gas endpoint installation on the Dresser ROOTS
®
Rotary Meter is complete.
Installing the 100G Datalogging Commercial Gas Endpoint on a
Dresser ROOTS
®
Rotary Meter with an Instrument Drive
The information in this section guides you through the installation of the 100G Datalogging commercial gas
endpoint on Dresser ROOTS
®
rotary meters.
Note This installation procedure requires a Dresser ROOTS
®
rotary gas meter with an instrument
drive. These instructions show an Elster American 100G Datalogging commercial gas endpoint.
The installation procedure is identical for the Sensus/Rockwell 100G Datalogging commercial gas
endpoint.