User's Manual
Sensus/Rockwell Meter Installation
TDC-0823-005 100G Datalogging Installation Guide - Direct Mount 20
Proprietary and Confidential
2. Examine the mounting screws. If they are 5/8" long and not corroded, keep them to attach the 100G
Datalogging gas endpoint assembly. If the screws are not the correct length or if the screws are corroded,
discard.
Note You may use the removed index cover as a temporary storage container for
screws. Properly dispose all unused screws, old index covers, gaskets, tamper seals, and other
leftover materials. Do not leave materials on customer premises.
3. Unscrew one index mounting screw completely. Hold one hand under the index to catch the screw. While
removing the other mounting screw, pull the index away from the meter to keep the index backplate
against the back of the screw. Remove the screw completely after the index is free of the meter.
4. Set the index aside where it will not be damaged or fill with dirt, rain or snow. The index will be mounted
in the endpoint later in this procedure. Verify the index mounting screws are 5/8" long and not corroded.
If the screws are the correct length and not corroded, retain for later use. If the original screws are
discarded, use the correct replacement screws (see Installation Prerequisites on page 7.)
5. Remove the old gasket, gasket residue, and dirt from the meter (if applicable). The meter face must be free
of gasket residue or dirt before you install the 100G Datalogging gas endpoint.