User's Manual
100G Datalogging Gas Endpoint
TDC-0823-005 100G Datalogging Installation Guide - Direct Mount 9
Proprietary and Confidential
Installation Overview
Installing the 100G Datalogging gas endpoint on a meter involves four tasks:
1. Removing the index cover and index from the 100G Datalogging gas endpoint.
2. Assembling the 100G Datalogging gas endpoint and index.
3. Programming the 100G Datalogging gas endpoint assembly.
4. Attaching the 100G Datalogging gas endpoint to the meter.