User's Manual
Chapter 3 Sensus Meter Installation
28 Natural Gas Solutions 100G Installation Guide for Direct Mounting on Meters
TIP Use the index cover you just removed as a temporary storage location
for screws.
NOTE Dispose of the index cover properly when finished with the installation
procedure. Do not leave it on customer premises.
4. Unscrew one index mounting screw completely.
5. Remove the other index mounting screw.
6. Place the index where it will not be damaged; get filled with dirt, rain or snow; or fall
to the ground or floor. The index will be used later in this procedure.
7. Examine the index screws you just removed. Verify that they are 5/8-inch long and
are not corroded.
If the screws are 5/8-inch long and are not corroded, keep them for later use.
If the screws are an incorrect length or are corroded, dispose of them properly.
Use 6 -32 x 5/8-inch screws as described in
Replacement Screws on page 26, if
required.
8. Use a putty knife or similar object to completely remove the old index gasket from the
meter (if applicable). All traces of the gasket must be removed before the ERT is
installed.