Chapter 4 Actaris Meter Installation Only two screws are required to mount the 100G ERT Module. Dispose of the extra screw properly. Do not leave it on the customer premises. 4. Press new tamper seals into place with an 11/32 nut driver, or other blunt tool. Attaching the 100G ERT Module to Flat-faced Model 1A Meters If you want to install a 100G ERT Module on a flat-faced model 1A meter you will have to use the CFG-0015-001 adapter kit.
Installing the 100G ERT Module 2. Remove the drive dog from the meter and replace it with the one from the kit. IMPORTANT Do not use a tool to install or tighten the new drive dog, hand tighten only. 3. Attach Adapter Shim Plate to the meter, as shown, using the two index mounting screws from the kit. Apply 15 to 20 inch-pounds of torque to the screws to provide a tight seal between the shim plate and the meter.
Chapter 4 Actaris Meter Installation 4. Turn the white wriggler so one of its four drive slots lines up with the drive dog. 5. Gently place the 100G ERT Module on the meter. If there is a gap between the gasket and the meter, it is probably because the drive slot of the ERT module assembly's wriggler is not properly aligned with the meter wriggler drive dog. To correct this, remove the assembly and repeat the alignment procedure in step one. 6.
Installing the 100G ERT Module Only two screws are required to mount the 100G ERT Module. Dispose of the extra screw properly. Do not leave it on the customer premises. 7. Press new tamper seals into place with an 11/32 nut driver, or other blunt tool.
Chapter 4 50 Actaris Meter Installation Natural Gas Solutions 100G Installation Guide for Direct Mounting on Meters
CHAPTER 5 National/Lancaster Meter Installation This chapter shows you how to install a 100G ERT Module on the 175-250 CFH National/Lancaster gas meter. Index Compatibility The 100G ERT Module for National/Lancaster meters can only be used with dial type indexes from National or Actaris/Schlumberger. Installation Prerequisites The following items are required to install the Itron 100G ERT Module.
Chapter 5 National/Lancaster Meter Installation Materials Supplied By You The following tools are required to install, initialize, and check the 100G ERT Module on the meter. Small and medium flat-blade or Phillips screwdrivers Used to remove and tighten index and index-cover screws. Side-cutting plier/wire snips Used for cutting wire seals, if necessary. Small putty knife Used to remove all traces of old gaskets from the meter.
Installing the 100G ERT Module Installing the 100G ERT Module There are four steps to installing the 100G ERT Module on a meter: Remove the index Assemble the 100G ERT Module Program the 100G ERT Module Attach the 100G ERT Module to the meter. NOTE Properly dispose of all unused screws, old index covers, gaskets, tamper seals, and other left over materials. Do not leave any materials on customer premises.
Chapter 5 National/Lancaster Meter Installation 4. Remove the index mounting screws and the index from the meter. 5. Remove all traces of the old index cover gasket from the meter. The new ERT module has its own gasket. 6. Verify the meter drive dog sticks straight out from the meter.
Installing the 100G ERT Module 7. If the index has mounting legs, make sure each leg is parallel to the back of the index (as shown) to provide proper alignment between the ERT and meter. 8. Verify the index wriggler is parallel to the surface of the index. Indexes that do not have mounting legs must be attached to the ERT module’s index backplate mounting posts. Indexes that have mounting legs only, must be attached to the ERT module's index bracket mounting posts.
Chapter 5 National/Lancaster Meter Installation If you are attaching the index to the 100G ERT Module using mounting legs, use Itron SCR-0015-001 screws. If you remove the two mounting legs and attach the index to the 100G ERT Module backplate mounting posts, use Itron SCR-0037-001 screws. To attach the index to the 100G ERT Module using the mounting legs 1. Get two new screws (part number SCR-0015-001) for attaching indexes to ERT modules by their legs. 2.
Installing the 100G ERT Module 3. Place the index’s mounting leg screw slot under the screw head and tighten the screw enough to hold the index leg in place, but loose enough so you can pivot the index around the screws. 4. Make sure the index’s right mounting leg screw slot is positioned over the ERT module’s right index mounting leg screw hole. 5. Turn each screw 1/4 to 1/2 turn after it contacts the mounting leg. To attach the index to 100G ERT Module without mounting legs 1.
Chapter 5 National/Lancaster Meter Installation Program the ERT The ERT must be programmed using the FC200SR with EndPoint-Link software. See the Endpoint-Link ERT Programming Guide (TDC-0411) for more information. IMPORTANT You must perform the following programming procedure for the ERT module to function properly. To program the ERT module 1. Using the FC200SR, program the reading of the index that was on the meter into the ERT module assembly.
Installing the 100G ERT Module To attach the 100G ERT Module to the meter 1. Get two new ERT module mounting screws (part number SCR-0014-004). 2. Carefully place the ERT module assembly on the meter. Make sure the meter drive dog aligns with the white wriggler drive slot. 3. Make sure there is no gap between the 100G ERT Module and the meter. If there is a gap, the end of the meter drive dog is probably riding on the face of the ERT module wriggler drive post instead of in its drive slot.
Chapter 5 National/Lancaster Meter Installation 5. Install tamper seals over the screws and press them into place with an 11/32 nut driver, or some other blunt tool.
CHAPTER 6 American/Actaris Commercial Meter Installation This chapter shows you how to install a 100G ERT Module on an American Commercial meter. Before installing the 100G ERT Module, verify you have: A compatible meter shown in the Meter Compatibility List. A compatible index. Itron 100G ERT Module can be used with standard dial and direct read (odometer) indexes. The list of materials defined under Installation Prerequisites in this chapter.
Chapter 6 American/Actaris Commercial Meter Installation Materials Supplied by Itron The following items are supplied by Itron: 100G ERT Module New tamper seals Four screws for securing the 100G ERT Module assembly to the meter. These screws may have holes drilled into the heads to accept wire tamper seals. Two internal-tooth star washers for the mounting screws when using metal index plates. Two cork washers and two flat washers for the mounting screws when using plastic index covers.
Installing the 100G ERT Module There are two types of index mounting plates for American Commercial meters. One type is made of plastic and has tamper seal cups. The other type is made of metal and has no tamper seal cups. Similarly, there are index covers with tamper seal cups and covers without tamper seal cups. Installing the 100G ERT Module There are four major steps to installing the 100G ERT Module on a meter: Remove the index or index and cover mounting plate.
Chapter 6 American/Actaris Commercial Meter Installation To remove the index 1. Note the orientation of the index. Remove the tamper seals or wire seals from the index cover and the mounting plate screws. For illustrative purposes in the procedure, a plastic index mounting plate with tamper seal cups was used. 2. Remove the index cover screws from the meter. Verify they are 1/2-inch long and not corroded. If the screws are the correct length and not corroded, keep them for later use.
Installing the 100G ERT Module If the screws are an incorrect length or are corroded, dispose of them properly. Use the screws listed in Replacement Screws on page 62, if necessary. 3. Remove the gasket from the index cover mounting plate and set it aside where it will not get damaged. You will use the gasket later in the installation.
Chapter 6 American/Actaris Commercial Meter Installation 4. Remove the four tamper seals from the mounting plate. 5. Remove the mounting plate screws and separate the mounting plate from the meter. Set the mounting plate aside where it will not get damaged. You will use it later in the installation.
Installing the 100G ERT Module Program the ERT The ERT must be programmed using the FC200SR with EndPoint-Link software. See the Endpoint-Link ERT Programming Guide (TDC-0411) for more information. IMPORTANT You must perform the following programming procedure for the ERT module to function properly. To program the ERT module 1. Using the FC200SR, program the reading of the index that was on the meter into the ERT module assembly.
Chapter 6 American/Actaris Commercial Meter Installation To attach the 100G ERT Module to the meter 1. Turn the ERT module upside down and turn the wriggler until its drive notches line up with drive teeth of the meter wriggler. IMPORTANT Handle the 100G ERT Module carefully so the metal passive radiator antenna is not damaged.
Installing the 100G ERT Module 2. Position the ERT module so its screw holes line up with the screw holes in the meter top then place the ERT module on the meter top. Make sure the INLET label on the ERT module is next to the INLET label on the meter case. 3. Carefully lower the 100G ERT Module onto the meter top so that its notches align with the teeth on the meter wriggler.
Chapter 6 American/Actaris Commercial Meter Installation 4. Make sure there is no gap between the bottom of the ERT module and the top of the meter. If there is a gap, it is because the drive notches of the ERT module's lower wriggler are not properly aligned with the meter wriggler's drive teeth. WARNING! Do not press down on the ERT module if there is a gap. If you do, you may damage the ERT module or the meter wriggler. 5.