User's Manual
Installing the 100G ERT Module
2. Detach the index cover from the meter by removing the four screws holding it in
place.
3
4
1
2
3. Examine the index cover screws you just removed. Verify that they are 5/8-inch long
and are not corroded.
• If the screws are 5/8-inch long and are not corroded, keep them for later use.
• If they are an incorrect length or are corroded, dispose of them properly. Use 10
- 24 x 5/8-inch screws as described in
Replacement Screws on page 29 instead.
TIP You can use the index cover you just removed as a temporary storage
location for screws.
NOTE Dispose of the index cover properly when finished with the installation
procedure. Do not leave it on customer premises.
4. Unscrew one index mounting screw completely.
5. Remove the other index mounting screw.
6. Set the index aside for the moment. Place it where it will not be damaged; get filled
with dirt, rain or snow; or fall to the ground or floor. The index will be used later in
this procedure.
7. Examine the index screws you just removed. Verify that they are 5/8-inch long and
are not corroded.
Natural Gas Solutions 100G Installation Guide 31