User's Manual
Table Of Contents
- Foreword
- Important Safety Information
- Contents
- About this Document
- Related Publications
- Product Description
- Features
- Specifications
- Air Interface
- Product Functionality
- Contents
- Integration Goal and Objectives
- Customer Problem Isolation
- Wireline and Wireless Communications
- Design Tips for Serviceability
- Environmental Issues
- Regulatory Requirements
- Contents
- Power Supply
- Host Interface
- Power Management
- Antenna Systems
- Hardware Recommendations
- Battery Selection Criteria
- Contents
- Hardware Integration
- Application Software
- Final Assembly
- Installation
- Troubleshooting
- End User Problem Resolution
- Service Depot Repair
- Contents
- Accessories and Options
- Abbreviations and Acronyms
- Desense Overview
- Desense Measurement Techniques
- Preparing the Device Under Test
- Performance Goals
- Methods of Controlling Emissions
- Antenna
- Summary
- FLEX Application Protocol Licensing
- Licensing
5-4 July 23, 2002
Testing CreataLink2 XT Hardware Integrator’s Guide
Final Assembly
Final Assembly
Before any product is shipped, a final assembly test should be performed to ensure
that all components are working properly and have been checked for loose
connections and proper software load. In this test, the data transceiver sends and
receives messages to itself or another data transceiver or two-way pager of the size
used in the application. Successful return of the message demonstrates that the
product is able to transmit and receive correctly.