User's Manual
Table Of Contents
- Foreword
- Important Safety Information
- Contents
- About this Document
- Related Publications
- Product Description
- Features
- Specifications
- Air Interface
- Product Functionality
- Contents
- Integration Goal and Objectives
- Customer Problem Isolation
- Wireline and Wireless Communications
- Design Tips for Serviceability
- Environmental Issues
- Regulatory Requirements
- Contents
- Power Supply
- Host Interface
- Power Management
- Antenna Systems
- Hardware Recommendations
- Battery Selection Criteria
- Contents
- Hardware Integration
- Application Software
- Final Assembly
- Installation
- Troubleshooting
- End User Problem Resolution
- Service Depot Repair
- Contents
- Accessories and Options
- Abbreviations and Acronyms
- Desense Overview
- Desense Measurement Techniques
- Preparing the Device Under Test
- Performance Goals
- Methods of Controlling Emissions
- Antenna
- Summary
- FLEX Application Protocol Licensing
- Licensing
B-6 July 23, 2002
Appendix B CreataLink2 XT Hardware Integrator’s Guide
Preparing the Device Under Test
Preparing the Device Under Test
If the host device contains multiple sections that power up and down independently,
make provisions to control the power to different sections during testing. This
serves to isolate each section and enables you to locate the source of any emissions.
The host device must remain powered during the entire test cycle. Typical circuit
blocks to power-on and exercise include:
•User displays
• Interface drivers and power supplies
• Peripheral silicon
• Mass storage devices and controllers