Use and Care Manual
Step 5. The sewage outlet is inserted into the sewage pipe and the stainless steel clamp is locked and
clamped tightly outside to prevent high water pressure during sewage discharge, which will cause
the sewage hose to break loose and leak sewage.
Step 6. Plug in the power adapter and connect the other end of the socket to supply power.
Step 7. Place the bypass in the bypass position.
Step 8. Slowly turn on the main water supply.
Step 9. Open a cold water tap nearby and let the water run a few minutes till the water runs clean or
until the system is free of foreign material caused by plumbing work.
Step 10. Then, slowly open the water inlet valve (the valve should be opened at an angle of about
45°), fully open the water outlet valve. and let the water run until the air is purged from the unit.
Then close the tap. The air in the tank is then exhausted until it is full.
Step 11. Operate the bypass to the service position and observe whether there is water leakage or any
other leakage at each connection. After ensuring safety, close the water inlet valve and soak the
filter material for 10 minutes.
Step 12. Fully open the water inlet valve. Close the water outlet. Next, regenerating immediately
once or twice, Regeneration Cycle (80 minutes).
All keys will lock after 3 minutes during the standby status. Press and hold the
“MENU” key for 3 seconds to unlock.
Step 12. a. To perform the Regeneration Cycle, press and hold the "SET/REGEN" button for 3
seconds to enter the manual regeneration mode, and choose immediate regeneration.
Step 12. b. Backwash (20 minutes)
Step 12. c. Air-Draw (60 minutes)
Step 12. d. Unit Returns to the In-Service Position
Regeneration Cycle: backwash (20 minutes) and air-draw (60 minutes).
Step 13. Return the bypass to the service position.
Step 14. Open a cold water tap nearby and let the water run. Then close the tap. Verify the water is
completely clear before use.
Step 15. Check again for any water seepage in the laying pipeline and whether the fittings at the
connection parts with the original pipeline cause loosening or water seepage from construction.
Step 16. Set up the system parameters of the equipment (see Programming the Central Water Filtration
System for details, p.14 ~ p.16).
Default regeneration process: backwash (20 minutes) and air-draw (60 minutes).
Step 17. Clean the installation site.
Page 13 www.123filter.com | (678) 261-7611 | support@123filter.com