Product Manual

12
Figure 3-6
10. Unfold trailer, and then fold front frame onto rear frame. The tow bar will now be on top.
STEP 4
1. Install left spring hanger (12L) and right spring hanger (12R) to rear frame rails with M10 x 30 bolts (C),
M10 x 20 bolts (D) and M10 nylon lock nuts (G) as shown. See figure 4-1.
Figure 4-1
2. Connect left caster base (30L) and right caster base (30R) to left (12L) and right (12R) spring hangers with
M10 x 20 bolts (D) and M10 nylon lock nuts (G). See figure 4-2.
Right Rear Side Figure 4-2 Left Rear Side