Product Manual

8
SYSTEM AIR PURGE PROCEDURE
IMPORTANT: BEFORE FIRST USE
Perform the following Air Purge Procedure to remove any air that may have been introduced into the hydraulic
system as a result of product shipment and handling. This step is to be completed without any weight on the jack.
1. Turn release valve counter-clockwise on full turn to the open position.
2. Rapidly pump the handle 6-8 times. Leave handle in down position to expose oil fill plug.
3. Remove cover plate.
Cover Plate