UFO Tilt Mount Installation Manual

TILT MOUNT INSTALLATION MANUAL - 3©
2016 IRONRIDGE, INC. VERSION 1.10
CHECKLIST
PRE-INSTALLATION
Verify module compatibility. See Page 10 for info.
TOOLS REQUIRED
Cordless Drill (non-impact)
Impact Driver (for lag bolts)
Torque Wrench (0-250 in-lbs)
5/16” Socket
7/16” Socket
3/8” Socket (deep)
String Line
TORQUE VALUES
Tilt Leg Nuts (3/8" Socket): 250 in-lbs
Bonded Splice Screws (5/16" Socket): 20 in-lbs
Grounding Lug Nuts (7/16" Socket): 80 in-lbs
Grounding Lug Terminal Screws (7/16 Socket): 20 in-lbs
Universal Fastening Objects (7/16" Socket): 80 in-lbs
Expansion Joint Nuts (7/16"): 80 in-lbs
Microinverter Kit Nuts (7/16" Socket): 80 in-lbs
í If using previous version of: Integrated Grounding Mid Clamps,
Grounding Lug, End Clamps, and Expansion Joints please refer to
Alternate Components Addendum version 1.0
IRONRIDGE COMPONENTS
End Cap
XR Rail
Tilt Leg Kit
Bonded Splice
Stopper Sleeve
Wire Clip
Microinverter Kit
UFO
Grounding Lug Expansion Joint