User Manual
© 2019 IronRidge, Inc. All rights reserved. Visit www.ironridge.com or call 1-800-227-9523 for more information. Version 1.0
Tech Brief
Deliver a Knockout in
Record Time
Remove the tile and mark the rafter. Use the
base as guide to drill 1/4” pilot hole and ll with
roong manufacturer’s approved sealant.
Insert the lag bolt with bonded washer through
the base into the pilot hole. The base can be
installed parallel or perpendicular to the rafter.
Press the Tile Replacement Flashing onto the
base until a dent forms over the post. Form the
edges of the ashing to quickly create a tight t.
Place the L-Foot over the top of the dent and
strike with the hammer to punch the threaded
post through the ashing.
Once the L-Foot is positioned, torque the hardware
to 132 in-lbs and attach the rail to either side of the
L-Foot and torque hardware to 250 in-lbs.
25-Year Warranty
When using Knockout Tile with XR Rail, the entire assembly is covered by IronRidge’s 25-year warranty.
To learn more about IronRidge’s product warranty, visit the IronRidge website at www.ironridge.com.
Dimple
Strike With
Hammer
Torque to
250 in-lbs
Torque to 132 in-lbs
DENT IT
STRIKE IT
DRIVE IT
No Struggling to Align Components
Punch through the ashing anywhere in these zones.
S-TileFlat Tile W-Tile