RAIL INSTALLATION
A. INSTALL RAIL HANGERS
Insert Rail Hangers onto rear of enclosure at locations
provided.
➢ Rail Hangers will click when fully seated.
B. MOUNT TO RAIL
Use rail-specic MLPE mounting hardware to attach Rail
Hangers to rail. Ensure junction box is pushed as close
to the rail as possible. Torque to 80-in lbs(1/2" or 7/16"
socket), do not overtighten.
➢ If installing in areas with ground snow loads greater
than 40 psf, install JayBox directly next to module
frame edge.
C. SECURE LID
Install wiring, conduit and ttings per NEC
requirements and following local AHJ guidance.
Using Philips Head Driver tighten the bolt.