JayBox Installation Manual
©
2022 IRONRIDGE, INC. VERSION 1.2 JAYBOX INSTALLATION MANUAL - 5
PRODUCT OVERVIEW
A. DRILL THE BOX
Prior to installation, use step drill bit to place pass through holes for conduits
or water-tight connectors. Drill bit starter locations are provided on the sides
and front of enclosure. Do not install conduit facing up roof.
INSTALLATION PREPARATION
Drill Starter Locations
B. OPTIONAL DIN 3 RAIL INSTALLATION (USER SUPPLIED)
If installing your own Din 3 Rail, using standard 35mm x 7mm Din 3 Rail
is recommended. Install Din 3 Rail at preferred location using hardware
provided. Up to 7” long Din 3 rail can be installed in one horizontal orientation
and three vertical options within the box using the provided #8 x 3/8” Phillips
head screws.
C. OPTIONAL GROUNDING DEVICES (USER SUPPLIED)
Install grounding buss bar or lug at any screw boss location using hardware
provided: #8 x 3/4” Phillips head screws.
Side View Front View
Grounding Bar can
be installed in any
orientation that the
mounting holes allow
Din 3 Rails can be
installed in any
combination or
orientation that
mounting holes
allow