Contour Install instructions
Table Of Contents
©
2022 IRONRIDGE, INC. VERSION 3.5 FLUSH MOUNT INSTALLATION MANUAL - 8
EXPANSION JOINTS
BOSS
Insert BOSS into rst Rail up to the Alignment Circle, Slide
second Rail over BOSS to the second Alignment Circle,
leaving a 1" gap between the Rails.
There must be a 1" of space between the edge of the Rail
and the edge of the panel to allow proper installation of the
UFO and Stopper Sleeve.
A A
B B
C C
D D
E E
F F
8
8
7
7
6
6
5
5
4
4
3
3
2
2
1
1
No Modules Over Gap
One Bonding Strap Per Break In
Array
A A
B B
C C
D D
E E
F F
8
8
7
7
6
6
5
5
4
4
3
3
2
2
1
1
No Modules Over Gap
No Bonding Strap required for
BOSS
Expansion Joints are required every 100' of continuous rail to allow for thermal expansion and contraction of the system.
➢ Do not install modules over expansion joint.
1" Gap Alignment
Circles