Contour Install instructions
Table Of Contents
©
2022 IRONRIDGE, INC. VERSION 3.5 FLUSH MOUNT INSTALLATION MANUAL - 12
TILE
Orient Base to desired position
Tighten until fully seated
Torque to
250 in-lbs
QM TILE REPLACEMENT
Remove tile and mark rafter. Measure up 8 3/4" from the
adjacent tiles and mark horizontal across rafter. Align
baseplate over rafter so that the lag holes align with the
post groove. The orientation of the plate can be adjusted
cross roof, mark location of lag holes on the roof. Drill two
1/8" Pilot holes and back ll with roong manufacturers'
approved sealant. Waterproof at underlayment level
according to roong manufacturers' instructions and the
Tile Roong Industry Alliance guidelines. Use T-30 Torx
bit to lag base into position. Insert Grade 8 Serrated
Flange Bolt into bottom of the Post, slide Post into
Base channel. Line up post with the hole in the Tile
Replacement Flashing. Leave loose for adjustments.
Place Tile Replacement Flashing over the Post and Mount,
allowing the ashing to properly interlock with surrounding
tiles. Secure Post by tightening with channel lock pliers.
Replace all tiles. Apply a bead of sealant where the post
meets the ashing, slip EPDM collar over post and down to
ashing. Attach L-Foot on Stando with hardware. Torque
to 174 in-lbs (14.5 ft-lbs). Attach rail to L-Foot with
Bonding Hardware and torque to 250 in-lbs (21 ft-lbs).
➢ If deck level ashing is required, approved ashing methods
include user supplied adhesive backed exible ashing.
➢ For additional details refer to the full QM Installation Manual.
Remove tile and mark rafter. Use base as guide to
drill 1/4” pilot hole and ll with roong manufacturer’s
approved sealant. Install optional Roof Flashing and seal
appropriately. Insert lag bolt with bonded washer through
base (and ashing if used) and drive until fully seated.
Insert Tile Replacement Flashing, lower onto base and
apply pressure over the threaded post until it dimples the
ashing. Place L-Foot over dimple and tap with hammer to
punch threaded post through the ashing. Ensure punched
pieces of ashing are cleared away. Form ashing as
needed to sit ush with surrounding tiles, position L-Foot in
desired orientation and torque hardware to 132 in-lbs (11
ft-lbs). Attach rail to L-Foot with Aire Dock and torque to
250 in-lbs (21 ft-lbs).
➢ Base can be installed in any orientation relative to rafter.
➢ Ensure L-Foot does not extend above rail.
➢ Optional deck level ashing is available. Standalone installation
manual available on website
➢ Standalone Knockout Tile manual available on website.
Rafter
Dimple
Tap With
Hammer
Torque to
132 in-lbs
KNOCKOUT TILE