Installation Sheet
SURFACE MOUNT INSTALLATION
2. PRE-DRILL PILOT HOLES
Using a 1/4” drill bit, pre-drill holes in 
the upper and lower cross braces 
inside the cabinet as determined in 
previous step. Ensure that the holes in 
both braces are drilled to the same 
measurement.
1. PREPARE CABINET
Screws will be drilled through the 
upper and lower cross braces inside 
the cabinet. Determine location of 
screws, ensuring that the location of the 
mounting screw is as close to the center 
of the cabinet as possible. 
Example shown with 
studs & unit to illustrate 
mounting. 
Partially insert a #14 x 4” screw 
in the upper cross brace.
4. PARTIALLY INSERT SCREW
3. LOCATE & MARK STUD
Using a stud nder, locate stud in wall 
and mark the wall according to the pre-
drilled holes in cabinet. Setting cabinet 
aside, pre-drill holes in wall using a 1/4” 
drill bit. Do not attempt to mount only 
through hard board of cabinet.
5. INSTALL UNIT
Begin installation by carefully lifting 
unit into position. Then, attach the 
cabinet to the wall by fully inserting 
the screw in the upper cross brace 
into the wall stud.
Make sure the unit is plumb and 
level. Shim if necessary. Fully tighten 
installation screw.
6. INSERT SECOND SCREW
Insert the second #14 x 4” screw into 
the pre-drilled hole in the bottom 
brace of the cabinet and attach to 
wall making sure cabinet remains 
square and level. 
7. ADD TRIM
Add Decorative trim or molding to 
make cabinet sides ush with the face 
frame. 









