Product Manual

4
TRANSFER PUMP SPECIFICATIONS
115 VOLT/AC
60HZ
1/3HP
6.5 AMPS
30 MINUTE DUTY CYCLE
NOTE: A Duty Cycle is the time specified for the motor to run
continuously. An auto shut down and cool down time will engage.
DO NOT USE WITH GASOLINE!
Do not dry run or dead head this pump assembly.
Do not use with water or water contaminated fluids.
Do not use with gasoline or alcohol, as a static charge is possible
and an explosion could occur.
Do not use in hazardous locations.
To obtain the best flow rate of 18GPM, remove filter from the
housing and install a 1” fuel hose on the intake and the discharge
port.
SET UP INSTRUCTIONS
STEP 1
It is recommended that you visit the site 48 hours before tank
sweeping to prepare the tank and assess the site condition. Using the
IPA9049 sampling tool, insert the sampler all the way down to the
bottom of the tank to be cleaned. Draw the piston shaft up enough to
get a good sample of the fuel (approx. 12”). Remove the sampler and
note the amount of water and crude at the bottom of the tank.
Transfer the sample into a glass jar and allow the various
contaminants to settle and separate for 24 hours. This will give you
an idea of the fuel condition inside the tank and the amount and type
of the contaminated fuel.
STEP 2
Add an algae bio-cleaner or an equivalent to the tank in appropriate
amounts. Using the sampler, stir the tank briskly to mix the algae