Product Manual

PART 6: GENERAL CONTROLS AND OPERATIONS
6.1 INITIAL STARTUP AND SHUTDOWN
All functions of the MUTT® require the Power Source Switch to be in BATTERY or
EXTERNAL position.
POWERING UP
1. Push the Power Source Switch to BATTERY or EXTERNAL.
POWERING DOWN
1. Prior to shutting down, exhaust all air from the brake lines, and return all air control
switches to the CLOSED position.
2. Push the Power Source Switch to the OFF position.
NOTE: Turning the power off will disengage the service brakes but NOT the
emergency/parking brakes. Exhausting the Emergency Side air will engage the
spring/parking brakes. See pg. 22 for exhausting/dumping air pressure.
0
DC
AMPERES
30
1
0
2
0
Set Power Source to BATTERY or EXTERNAL
10
0
DC
AMPERES
30
1
0
2
0
Set Power Source to OFF