User's Manual
SECTION 3: INSTALLATION INSTRUCTIONS
516.80548.POM_REVA_Product_Owner's_Manual_M64780D25_FCCRpt.doc Page 14 of 44
ECN-5277
44
Carling Switch Installation (DPST Heavy Duty Toggle)
To install the switch, perform the following steps:
Step 1 Mount the switch in the selected location.
Step 2 Route and wire a red wire (#12 AWG) from the switch to the Automotive Power Relay
(see the figure below).
Step 3 Ground the switch by routing and wiring a black wire from the switch to the chassis
ground.
Figure 10: Carling Switch Installation