User's Manual

CHAPTER 4: PRODUCT INSTALLATION
2003 IPMobileNet, Inc. 27 IPSeries MR User Manual / Rev. A / 04-September-03
Post Installation Checklist
Table 7 lists the tasks that should be performed upon completing installation.
TABLE 7: POST INSTALLATION CHECKLIST
NO. CHECKLIST ITEM þ
1 Scope out the entire area setup to locate any obvious problem areas. ¨
2 Check antenna routing for safety concerns and near-field boundary setup. ¨
3
Use tie wraps, where possible to ensure that all cables routed in parallel are
bundled together.
¨
4 Perform appropriate testing to ensure base station works properly. ¨
! Once installation is complete make sure the area is clear of debris that would prevent proper
airflow and ventilation.