User's Manual

© ip.access Ltd
COMPANY CONFIDENTIAL 110#010XA_GDE.doc
- 9 -
Installing the nanoBTS
Pre-Installation Checklist
Prior to installation and following a technical site survey, ensure that the following items are
available.
1. Details of placement of PSUs (at central site or at nanoBTS).
2. The following system information is required for each nanoBTS:
The ARFCN (Absolute Radio Frequency Channel Number) to be allocated to that
cell.
A specific IP address may be allocated to each nanoBTS location or a pool of IP
addresses may be provided and the installer allocates the IP address for each
nanoBTS.
Requirements for and details of any external antenna and mounting and locations.
BTS Id for each nanoBTS.
IP address subnet mask and default router IP address for the each nanoBTS.
3. For the installation site, the following information is required.
IP address subnet mask and default router IP address for the installation PC.
Printout of the site configuration plan produced as a result of the survey
A floor plan showing the mounting location of each nanoBTS, together with
location name and btsid.
Installing the nanoBTS
Parts required for each nanoBTS:
Wall fixings: These are not provided as part of the nanoBTS but should be
suitable for the wall material and weight of the nanoBTS (2.7kg). Suggested
materials are 4 x 30mm no.10 woodscrews or M5 bolts and wall plugs (if
required).
PSU.
NanoBTS complete with mounting bracket.
RJ45-RJ45 connecting leads
Tools required:
Installation:
Drill and masonry or wood bit.
Mounting bracket removal tool for removal of the bracket from the nanoBTS.
Spanner or screwdriver suitable for any fixings used for the mounting bracket.