Installation Instructions

© ip.access Ltd
COMPANY CONFIDENTIAL 110#010XA_GDE.doc
- 34 -
Appendix 3: Commissioning at the nanoBTS
If commissioning is to be done mostly at the nanoBTS instead of connecting the PC to
LAN in switch room (step 2) the laptop PC should be set up at the nanoBTS as shown the
diagram below using the power over Ethernet adapter to connect the PC onto the LAN
(the adapter applies the 48V DC to the nanoBTS). Connect a crossed RJ45 lead from the
adapter to the Ethernet connector on the nanoBTS.
Power Over
Ethernet
Adapter
nanoTRX
nano Installer
Laptop PC equipped with
nano Installer, Windhcpd
and TFTP software
~
Figure 33 Test Setup, Option 1
Page
Step 1.
Setting up PC for configuring nanoBTS ..................................................................15
Steps 2 to 7 performed at the nanoBTS
Step 2.
Connecting the nanoBTS........................................................................................16
Step 3.
Setting IP address and downloading operational software .....................................17
Step 4.
Calibration of nanoBTS using frequency synchronisation.......................................18
Step 5.
Check macro network channel usage.....................................................................19
Step 6.
BCCH Channel Usage Test ....................................................................................21
Step 7.
Retrieve BCCH frequency information....................................................................21
Disconnect installation PC and connect to RJ45 Ethernet
Step 8 performed at the BSC / Switch room
Step 8.
Measuring path loss between nanoBTS .................................................................22
Steps 9 and 10 performed in building
Step 9.
Walk Test................................................................................................................26
Step 10. Installation Report ...................................................................................................26
nanoBTS