Installation Manual
nanoBTS Installation Manual
nanoBTS Hardware Installation
© ip.access Ltd Page 11
2.5.8 Mounting Multi-TRX 165 nanoBTS
The 165 (EDGE) BTS may be installed in a stacked two-TRX configuration. See section
2.5.10 for details.
The procedure for mounting a stacked two-TRX configuration is as follows:
1. Fit the first wall bracket to the wall in the desired position.
2. Remove the plastic cover from the bottom unit.
3. Relocate the TX antenna as illustrated in section 2.5.10.
4. Fit the antenna cable (part number 165_072) as illustrated in section 2.5.10.
5. Fit the second wall bracket to the bottom unit as illustrated in section 2.5.10.
6. Mount the bottom unit on the wall.
7. Fit the Ethernet and TIB cables to the bottom unit.
8. Fit the skirt to the bottom unit.
9. Remove the plastic cover from the top unit and attach it to the bottom unit.
10. Attach the Ethernet and TIB cables to the top unit.
11. Replace the plastic cover on the top unit.