Installation Manual

nanoBTS Installation Manual
nanoBTS Hardware Installation
© ip.access Ltd Page 9
Figure 12 - nanoBTS bracket removal
Position the bracket on the wall and mark the position of the four screw holes. The top of
the bracket MUST be positioned uppermost. Ensure that the bracket is level and sufficient
clearance is maintained to allow the unit to be located on the bracket (at least 80mm from
the bracket to the top of wall, and 120mm from the side of the bracket to a side wall). See
Figure 13.
Figure 13 - Fixing the wall bracket
Drill the four holes in the positions marked previously and insert wall plugs (if required) and
fix the mounting bracket securely to the wall. The bracket is designed to allow the
nanoBTS unit to be mounted with the connections either at the top or at the bottom of the
unit.
Slide the nanoBTS onto the bracket and ensure that the retaining spring engages into the
indent at the rear of the unit.