Installation Manual

nanoBTS Installation Manual
nanoBTS Hardware Installation
© ip.access Ltd Page 8
Figure 10 - Chassis bond screw location - 139/140 nanoBTS
Connect the other end of the Chassis Bond lead to the next nanoBTS chassis bond point
in the chain.
Figure 11 - Chassis bond screw location - 165 nanoBTS
2.5.6 Mounting the nanoBTS
The location of each nanoBTS is shown on the installation floor plan produced at the
network planning stage. For example, it must take into account that all BTSs must be at
least 2m from any mobile equipment. The network wiring must be complete before the
nanoBTS can be installed and commissioned. The nanoBTS should be placed on a wall
(at or above head height) or on a ceiling. Unless explicitly stated otherwise, the following
procedure is common for both 139/140 and 165 hardware variants.
Remove the nanoBTS from the bracket by sliding the removal tool over the central fin
between the bracket and the body of the unit to disengage the locking spring, slide bracket
to separate it from the main body of the unit. The tool may be inserted from the top or
bottom of the nanoBTS.
Chassis
Bond Point